More Pictures of this Project |
|
Authorized Sales Representatives for Kuhns Bros Log Homes |
|
Basement waterproofing is done, floor joists are installed. |
|
Backfilling complete, Porch pads have been poured, and we’re starting up with the Logs!! |
|
Another picture of Logs going up. These are 6x8 D Kuhns Bros Logs. Note the exterior electric Box. |
|
Logs are all up and the Porch Decks are being framed. |
|
Interior shot. Note the solid Log Gables. This will be in the Great Room area. |
|
Another interior shot, looking back toward the Bedroom area. |
|
Another shot of the interior of the log wall and log gable, this is the kitchen/dining area. |
|
A good shot of the interior of the log wall. |
|
Trusses are set!! The crane really helps this job. |