More Pictures of this Project |
|
Authorized Sales Representatives for Kuhns Bros Log Homes |
|
Interior walls are framed and the trusses are set over the bedroom area. |
|
All the trusses are set, the Porch Decks are complete. We will be dried in soon. |
|
Another picture after the trusses are set. The gable on this end is not exposed on the interior will be covered with Log Siding. |
|
Detail shot of where an interior framed wall connects with the Log wall. Note there are (3) 2x4’s attached with Lag bolts and the log wall is notched for the interior T&G. |
|
Beautiful blue sky and a good day to finish the roof. Stack of 6x8 Exposed Beams have been Pre-stained and will be installed in the cathedral area. |
|
Another picture of the porch and roof area. This home has wrap-around porches all the way around. |
|
Picture from the back of the home, showing the wrap around porches. |
|
Another Exterior shot!! |
|
Picture looking up from below the walkout basement. |